Our whole home remodel in Dallas updates your entire house under a single plan. That covers the kitchen, every bathroom, flooring throughout, the floor plan itself, and the plumbing, wiring, and HVAC behind the walls. Most whole house renovations in Dallas take three to six months and land between $95,000 and $250,000, depending on home size and how much systems work the house needs. Texas Pro Remodeling handles the design, the permits, the materials, and the construction as one licensed team.
Typical Investment | $95K to $250K |
Timeline | 3 to 6 Months |
Permits | We Pull Them |
Contract Type | Design Build |
Consultation | Free |
Workmanship | Lifetime Warranty |
A+ Rating
Fully Protected
175+ Google Reviews
On All Work
Always Available
Most homeowners call us after years of fixing one room at a time. The kitchen got updated in 2019. A bathroom followed in 2022. Now the flooring changes three times between rooms, the finishes fight each other, and the layout still blocks the way the family actually lives.
A full home remodel solves that in one coordinated project. We plan every room together. The flooring runs continuously. The finish selections agree. The layout supports your daily routine instead of working against it. Here is what our Dallas whole home remodeling scope includes.
We rebuild the rooms you use every day. Our interior remodeling work in Dallas covers Kitchen Remodeling with custom cabinets and new countertops, bathroom remodeling across every bath in the house, and a master bathroom remodel designed around real storage and better light. We install continuous flooring throughout, hang and finish drywall, add millwork and finish carpentry, replace interior doors, and paint the whole home.
Older Dallas floor plans wall the kitchen off from everything else. We open them up. Our team handles floor plan redesign, load bearing wall removal by structural engineering, home additions, garage builds, and enclosed porch or patio remodels. Every structural modification goes through proper permits and inspection. An open concept remodel is the single most requested change we get from Dallas homeowners.
Systems work separates a real renovation from a cosmetic refresh. We replace aging supply lines, upgrade electrical panels, rewire outdated circuits, and improve HVAC zoning so the back bedrooms finally hold temperature. Dallas homes built before 1985 usually need at least two of these.
We match the outside to the inside. Exterior Remodeling in Dallas covers window replacement, door replacement, siding repair, exterior paint, and trim work that protects the home and lifts curb appeal.
| Project tier | Dallas market range | Cost per sq ft | What it covers |
| Cosmetic refresh | $40,000 to $95,000 | $15 to $60 | Paint, flooring, lighting, and fixtures throughout. Layout and systems stay in place. |
| Full whole home renovation | $95,000 to $250,000 | $60 to $125 | New kitchen and baths, flooring throughout, layout changes, partial systems updates. |
| Gut to the studs | $200,000 to $350,000+ | $150 to $300 | Everything back to the frame. New wiring, plumbing, HVAC, insulation, drywall, and finishes. |
Across the Dallas Fort Worth market, whole home remodels fall into three clear tiers.
| Project tier | Dallas market range | Cost per sq ft | What it covers |
|---|---|---|---|
| Cosmetic refresh | $40,000 to $95,000 | $15 to $60 | Paint, flooring, lighting, and fixtures throughout. Layout and systems stay in place. |
| Full whole home renovation | $95,000 to $250,000 | $60 to $125 | New kitchen and baths, flooring throughout, layout changes, partial systems updates. |
| Gut to the studs | $200,000 to $350,000+ | $150 to $300 | Everything back to the frame. New wiring, plumbing, HVAC, insulation, drywall, and finishes. |
Ranges reflect the 2026 Dallas Fort Worth remodeling market. Your written estimate comes after we inspect the home.
High end design build projects in Preston Hollow, Highland Park, and University Park regularly clear these ranges. Larger square footage, architect led plans, and premium finish packages push some Dallas renovations past $475,000.
Plan on three to six months from signed contract to final walkthrough. Larger homes and gut renovations run longer. Here is where that time actually goes.
Weeks 1 to 6
We measure the home, review the existing layout, and pinpoint what is not working. Structural engineering starts here if the plan involves wall removal or an addition. You lock in your floor plan direction and begin to finish selections.
Weeks 4 to 12
Permitting runs alongside design, and it takes longer than most homeowners expect. Plan review for structural work in Dallas commonly adds four to eight weeks before construction can start. Homes in conservation districts and historic districts face extra review on top of that.
We pull every permit under our license and coordinate every inspection. You never sit in line at the permit office or chase an inspector by phone. That is the whole point of hiring a single contractor for a remodel in DFW. One company handles the permits, the materials, the trades, and the schedule.
Months 2 to 5
Demolition comes first. Then framing, then rough in for plumbing, electrical, and HVAC. Inspections follow each rough stage. Drywall, flooring, cabinetry, tile, trim, and paint come after that, in that order. Your project manager sends a written update every week so you always know what happened and what comes next.
Final two weeks
We walk the house with you room by room. Every item you flag goes on a written punch list. We finish those items, hand over your warranty documentation, and close the project properly.
We run the same three steps on every project. You always know what happens next and what you receive at each stage.
We visit the house, listen to what frustrates you about the current layout, and inspect the condition. From there we develop floor plan concepts, coordinate structural engineering where needed, and write a detailed line item scope. You see a realistic budget range at the first meeting and a full written scope before any money changes hands. The consultation costs you nothing.
You choose flooring, cabinetry, countertops, tile, fixtures, and paint against a selection schedule. Every allowance goes in writing. Then we lock the price, pull the permits, and set your start date.
Your project manager runs the job site daily and reports to you weekly. One name, one phone number, one person accountable for the entire house. At the end we walk every room with you, complete each punch list item, hand over your warranty documents, and review manufacturer coverage on the products we installed.
A full home remodel can feel overwhelming when you are trying to manage design choices, multiple trades, timelines, and budgets all at once. Texas Pro Remodeling makes the process easier by handling your project from planning to completion with one experienced team.
We keep the work organized, communicate clearly, and help you make practical decisions that support both daily living and long-term value. Dallas homeowners choose us because they want quality workmanship, a smoother remodeling experience, and a finished home that feels complete, functional, and thoughtfully updated.
When you invest in a full home remodel, you want confidence that the work will hold up over time. Texas Pro Remodeling stands behind the quality of our remodeling work and takes pride in delivering results that are built to last.
Our commitment includes:
We also explain any applicable manufacturer warranties on the products used in your project so you know what is covered after installation.
Texas Pro Remodeling operates as a licensed general contractor in Dallas and the surrounding DFW area. We carry full general liability and workers compensation coverage, pull permits under our own license, and manage inspections directly with the City of Dallas.
Most whole home remodels in Dallas cost between $95,000 and $250,000. Cosmetic refreshes start near $40,000. Gut to the studs renovations run $200,000 to $350,000 or more. Home size, bathroom count, and systems replacement drive the difference.
Three to six months for most projects. Design and permitting take four to twelve weeks before construction starts. Construction itself runs two to five months, depending on scope.
It depends on scope. You can usually stay through a cosmetic refresh. Plan to move out for a gut renovation, since the home loses working plumbing, power, and HVAC. We tell you which applies during the consultation.
Yes. We pull all required permits under our license and coordinate every inspection. You never deal with the permit office yourself.
Yes, where the structure allows. We bring in a structural engineer, design the beam and support, pull a structural permit, and pass inspection. Opening a kitchen into the living area is our most requested layout change in Dallas.
Basements are rare in Dallas because most homes sit on slab foundations. If your home has one, we can remodel it. If you need more space and have no basement, a room addition or garage conversion usually returns more value per dollar spent.
Remodeling at once produces a more cohesive result and costs less per room. You pay mobilization, permitting, and design costs one time instead of five times. It also spares you years of repeated disruption.
Yes. We work with lenders who understand remodeling draw schedules. Many of our clients fund projects through a HELOC or a home equity loan.
All of Dallas, including Preston Hollow, North Dallas, University Park, Highland Park, Casa Linda, Forest Hills, and Lake Highlands. We also serve Coppell, Richardson, Plano, Lewisville, Flower Mound, Frisco, McKinney, Allen, Garland, Irving, Mesquite, Grapevine, Arlington, and Fort Worth.
You already know what is not working in your house. We can tell you what it costs to fix, how long it takes, and whether the numbers make sense for you. Book a free in-home consultation. We inspect the home, talk through your goals, and give you a straight answer. No pressure and no obligation.